HNTAS: what is proposed, what is not decided, and what to do now

The Heat Network Technical Assurance Scheme (HNTAS) is still a government proposal. The Department for Energy Security and Net Zero (DESNZ) consulted on it from 21 January to 15 April 2026. Its timetable puts the response, and the final technical standard, in early 2027, with regulatory commencement in 2027. As at 23 October 2026, the consultation page read “We are analysing your feedback”.

What HNTAS would be

A scheme that “will set the technical requirements that new and existing heat networks need to meet, alongside an assessment and certification process”.

  • Legal basis. The scheme documents would be designated under the Energy Act by a future piece of secondary legislation, which makes the requirements in them legal obligations for those in scope.
  • Who runs it. DESNZ proposes to carry out the Code Manager function itself, at least at first, with a single Certification Body, a Training Provider and a Scheme Operator at commencement.
  • Ofgem’s part. Ofgem would monitor compliance with the authorisation conditions; signing up to HNTAS would itself become a condition of authorisation for networks in scope.

Who it would apply to

  • New heat networks and “the c12,000 existing heat networks across Great Britain”.
  • The operator: “the operator would also be the entity required to meet the new technical standards”.
  • Size thresholds are proposed: no new network below six properties, or the equivalent capacity, and 450kW for existing and 225kW for new non-domestic or mixed networks. The threshold for existing domestic networks is still being consulted on, with eleven or more properties as one option.
  • Industrial sites would be excluded at launch.

What it would require

  • Assessment across the network’s life, in eight stages from concept design to ongoing monitoring. Passing an assessment earns a Statement of Conformity.
  • Two certificates: the first after commissioning and before customers are supplied, the second after two years of operation.
  • Certification before authorisation for new networks: passing HNTAS assessments and certification would be a prerequisite for becoming authorised.
  • A phased route for existing networks, registering in the first year and reaching certification several years later, on a timetable that depends on their metering.
  • Performance and metering targets, including heat losses of no more than 400 W per dwelling at the second milestone and 200 W per dwelling for certification, and heat meters to at least the equivalent of MID Class 2 accuracy.
  • TS1, the Heat Network Technical Standard that replaces CP1 (2020), as the most heavily referenced standard. The draft was published on 18 November 2025 (gov.uk).

What is not yet decided

  • The detailed technical requirements: the consultation “focuses on the overall design of the scheme rather than the detailed technical requirements”.
  • How far the scheme reaches into existing networks, including an option to stop at the second milestone rather than require full certification.
  • The five-year deadline for metering.
  • The longer-term governance of the Code Manager, and any financial or non-financial incentives.

What to do now

Register with Ofgem. Ofgem registration is not intended to depend on HNTAS. Existing networks must be registered on or before 26 January 2027: how to register.

From the consultation. Operators “should look to improve their networks at the earliest possible point and ahead of these deadlines”, and some parts of the scheme may open for voluntary engagement before regulation.

Our suggestions, which the consultation does not set out itself:

  • Find out what metering each network has, since that sets its proposed timetable.
  • Start keeping operational data, including heat losses, and check the accuracy class of your meters.
  • For schemes in development, record the planning and M&E contract status, which the proposals use to decide their route.

Common questions

Is HNTAS in force?

No. HNTAS is a proposal. DESNZ consulted on it from 21 January to 15 April 2026, and its timetable puts the government response in early 2027 and regulatory commencement in 2027. As at 23 October 2026 no response had been published.

Do I have to wait for HNTAS before registering with Ofgem?

No. The consultation says Ofgem registration is not intended to be contingent on HNTAS registration. Existing heat networks must be registered with Ofgem on or before 26 January 2027.

Who would HNTAS apply to?

New heat networks and, under the proposals, the roughly 12,000 existing networks in Great Britain, with the operator as the party required to meet the technical standards. Networks below proposed size thresholds and industrial sites would be excluded at launch.

What standard would HNTAS use?

The Heat Network Technical Standard, TS1, which replaces CP1 (2020) and is described in the consultation as the most heavily referenced standard. A draft of TS1 was published on 18 November 2025; the final version is due with the government response.

Does Caldora Compliance track HNTAS?

Not yet. Caldora tracks the 29 Ofgem authorisation conditions and Ofgem's reporting obligations, which apply now. It will add the HNTAS requirements once the final standards are published, and its regulatory change monitor watches the government's HNTAS pages until then.

Source: DESNZ, Heat network technical standards: consultation document, issued 21 January 2026. Checked against gov.uk on 23 October 2026. This page summarises proposals and is not legal advice.